top of page

Restoration Project

Twisted Train Tracks

For a group project, 3 other design students plus myself designed a historic building located in Fountain NC. The Fountain Depot was originally a railroad depot and was only one of two masonry train stations in Pitt County. It is believed that the depot was built by 1905 and is seen on the 1923 Sanborn map. Most of the windows were covered before 1989.

Interior and Exterior Photos

Marble Surface
historic exterior 3.png
Marble Surface
historic interior 1_edited.jpg
Marble Surface
historic exterior 2.png
Marble Surface
thumbnail_IMG_9756.jpg
Marble Surface
historic exterior 4.png
Marble Surface
historic interior 2_edited.jpg

Proposed Use

Based on the location and historical relevance of the Fountain Depot, the ideal concept for this building is to create a casual lounge space that is welcoming to the people of Fountain as well as individuals passing through. The overall design of the building will include and highlight original features that were included in the structure. The town of Fountain needs something that is accommodating to everyone. Somewhere where everyone, travelers and locals, will enjoy themselves. and have a good time. The idea of a lounge would be suitable for people of all ages and backgrounds. This lounge would also serve food and drinks. Breakfast, lunch, and dinner would be ideal. On weekends, this space could have live music and dancing, due to its ample amount of space. Ideally, this establishment would welcome studying students, those who enjoy live music, dancing, and cocktails, travelers who want a unique place to eat lunch.

Marble Surface

Inspiration Pictures

Floor plans

Marble Surface
base floorplan.jpg
Marble Surface
mechanical plan.jpg
Marble Surface
final floorplan sketch.png
Marble Surface
electrical plan.jpg
Marble Surface
final floorplan cad.jpg
Marble Surface
exterior floor plan.jpg

Base Floor plan

Final Sketch Floor plan

Final Floor plan

Mechanical Plan

Electrical Plan

Furniture & Exterior Floor plan

Major Issues Addressed
  • Interior stairs are uneven, sloped, and steep. 

    • Redid stairs and opened up entry space.

  • A wheelchair ramp and lift will need to be put in place for ADA compliance.

    • Opened up entry space to allocate a lift next to stairs.

  • Bathroom isn’t accommodating or suitable for the space, needs more than one stall with enough room for wheelchair to fit. 

    • Removed original bathroom and moved to a more suitable space.

​

  • Building has no mechanical systems such as, HVAC, fire-protectant mechanisms, water supply, ventilation, etc.

    • Added all mechanical systems needed throughout.

  • No gutter system has been applied to Fountain Depot

    • Added gutter system to support drainage of water. 

  • Dampness in all materials of building such as wood, foundation, brick, etc.

    • Restored, repaired, and replaced all materials that had dampness or could not support structure.

kitchen rendering.png

My Contributed Spaces

Catering Kitchen

This kitchen was designed with the goal of it being a catering kitchen. This kitchen is stretched between two rooms equipped with a double refrigerator/ freezer. The rooms also contain all appliances needed to cater large events. This included an oven and range to warm up food and also a full dish pit.

Catering Kitchen Floor plan

Room shown on the right

kitchen floorplan.jpg
Screenshot (572)_edited_edited.jpg

Room shown above

Full Service Bar

bottom of page